This section presents the work plan structure of the project as well as the deliverables to be produced. Public deliverables are available upon request through our contact section.
WP1 User Requirements
To identify and define the user requirements to be satisfied through the system/platform and the application scenarios where to carry out the project validation.
Deliverable number | Deliverable title | Due Date (inmonths) | Disseminationlevel |
D1.1 | User Requirement | 4 | Public |
D1.2 | Application Scenarios | 4 | Public |
WP2 System Design
The objective of this work package is to form the basis of the FURNIT-SAVER system design for its building in WP3, and its posterior testing and validation by end-users (WP4). The main challenge is to take the system to a commercial level of performance hence ensuring robustness, reliability, flexibility to accommodate changes, extreme ease of use, efficient, easily scalable, and compatibility with existing standards.
Deliverable number | Deliverable title | Due Date (inmonths) | Disseminationlevel |
D2.1 | System Architecture | 5 | Public |
D2.2 | In-depth design of the main modules | 5 | Public |
D2.3 | Guidelines and procedures for personal data treatment | 5 | Public |
WP3 System Development and Integration
The main objective of this WP is to develop the system designed in WP2. The various components will be developed and tested individually and then integrated to build up the overall system.
Deliverable number | Deliverable title | Due Date (inmonths) | Disseminationlevel |
D3.1 | Report on system development and integration |
11 | Confidential |
D3.2 | System integrated and ready for validation |
11 | Confidential |
WP4 System Validation
The aim of this work package is to assure that the developed system prototype, result of the WP3, meets the user requirements and system specifications defined in WP1 and WP2.
Deliverable number | Deliverable title | Due Date (inmonths) | Disseminationlevel |
D4.1 | Validation protocols | 10 | Public |
D4.2 | 14 | Public |
WP5 Dissemination and Exploitation
The overall purpose of this work package is to promote the acceptance of FURNIT-SAVER’ results via dissemination, exploitation and standardisation activities.
Deliverable number | Deliverable title | Due Date (inmonths) | Disseminationlevel |
D5.1 | FURNIT-SAVER project web site and collaboration platform |
1 | Public |
D5.2 | Business case report | 14 | Public |
D5.3 | Exploitation plan, Interim draft | 8 | Confidential |
D5.4 | FURNIT-SAVER whitepaper | 14 | Public |
D5.5 | Exploitation plan, final draft | 14 | Confidential |
WP6 Coordination
The main objective of this work package is the overall coordination of the FURNIT-SAVER project, ensuring the project is executed in a professional, timely and cost-efficient manner.
Deliverable number | Deliverable title | Due Date (inmonths) | Disseminationlevel |
D6.1 | Quality assurance and Risk Assessment plan |
2 | Public |
D6.2 | Data Management Plan | 6 | Public |