This section presents the work plan structure of the project as well as the deliverables to be produced. Public deliverables are available upon request through our contact section.

WP1 User Requirements

To identify and define the user requirements to be satisfied through the system/platform and the application scenarios where to carry out the project validation.

https://furnit-saver.cenfim.org/?p=616

Deliverable number Deliverable title Due Date (inmonths) Disseminationlevel
D1.1 User Requirement 4 Public
D1.2 Application Scenarios 4 Public

 


WP2 System Design

The objective of this work package is to form the basis of the FURNIT-SAVER system design for its building in WP3, and its posterior testing and validation by end-users (WP4). The main challenge is to take the system to a commercial level of performance hence ensuring robustness, reliability, flexibility to accommodate changes, extreme ease of use, efficient, easily scalable, and compatibility with existing standards.

Deliverable number Deliverable title Due Date (inmonths) Disseminationlevel
D2.1 System Architecture 5 Public
D2.2 In-depth design of the main modules 5 Public
D2.3 Guidelines and procedures for personal data treatment 5 Public

 


WP3 System Development and Integration

The main objective of this WP is to develop the system designed in WP2. The various components will be developed and tested individually and then integrated to build up the overall system.

Deliverable number Deliverable title Due Date (inmonths) Disseminationlevel
D3.1 Report on system development and
integration
11 Confidential
D3.2 System integrated and ready for
validation
11 Confidential

 


WP4 System Validation

The aim of this work package is to assure that the developed system prototype, result of the WP3, meets the user requirements and system specifications defined in WP1 and WP2.

Deliverable number Deliverable title Due Date (inmonths) Disseminationlevel
D4.1 Validation protocols 10 Public
D4.2

Validation results and recommendations

14 Public

 


WP5 Dissemination and Exploitation

The overall purpose of this work package is to promote the acceptance of FURNIT-SAVER’ results via dissemination, exploitation and standardisation activities.

Deliverable number Deliverable title Due Date (inmonths) Disseminationlevel
D5.1 FURNIT-SAVER project web site and
collaboration platform
1 Public
D5.2 Business case report 14 Public
D5.3 Exploitation plan, Interim draft 8 Confidential
D5.4 FURNIT-SAVER whitepaper 14 Public
D5.5 Exploitation plan, final draft 14 Confidential

 


WP6 Coordination

The main objective of this work package is the overall coordination of the FURNIT-SAVER project, ensuring the project is executed in a professional, timely and cost-efficient manner.

Deliverable number Deliverable title Due Date (inmonths) Disseminationlevel
D6.1 Quality assurance and Risk
Assessment plan
2 Public
D6.2 Data Management Plan 6 Public

 

Comments are closed.